NeuraEnterprise

SD-WAN and SASE

Design, migration and handover for multi-site networks.

We assess the estate, prove repeatable site patterns and migrate in waves.

  • Assess
  • Design
  • Prove
  • Migrate
  • Hand over
SD-WAN and SASE: delivery stagesAssess, Design, Prove, Migrate, Hand over.AssessDesignProveMigrateHand over
Stages: Assess, Design, Prove, Migrate and Hand over.

A consistent network across your sites.

Multi-site networks often grow one site at a time. Circuits come from several carriers, firewalls age at different rates and each site ends up a little different.

That makes the estate harder to change safely. A firewall renewal or the end of an MPLS contract can force a decision before the options are clear.

We assess the estate, design a small set of tested site patterns and prove them on your own sites before migration. We then hand over to your own team or existing MSP, with optional time-boxed post-migration support and advice.

Why choose this service.

01

Patterns that repeat

A tested design and build standard for each site type, with consistent security policy.

02

Proof before rollout

Prove the design on real sites before committing to a wider migration.

03

Controlled migration

Migrate in waves with a cutover plan and a way back if something goes wrong.

04

Vendor independence

Platform-agnostic designs, shaped by your estate rather than a vendor.

What this helps you achieve.

  • Consistent site builds
  • Safer network changes
  • Clearer renewal decisions
  • A documented handover to operations

SD-WAN and SASE delivery.

SASE combines remote access, web security and cloud-delivered firewalling. We sequence adoption around renewals, including when it makes sense to wait.

  1. Stage 01 · Understand the estate

    Assess

    Review sites, circuits, firewalls, support dates, traffic flows and application needs. Establish the options and costs.

  2. Stage 02 · Set the site patterns

    Design

    Define tested designs, naming, addressing, configuration standards and consistent security policy for each site type.

  3. Stage 03 · Test on real sites

    Prove

    Run a proof of concept on a small number of your sites before the wider rollout, so problems appear early.

  4. Stage 04 · Move in waves

    Migrate

    Plan cutover and rollback for each migration wave. Use zero-touch provisioning where the hardware supports it.

  5. Stage 05 · Transfer to your team

    Hand over

    Hand over site designs, configuration standards and backups, monitoring, firmware and patching arrangements, and change records to your team or MSP. Optional time-boxed post-migration support and advice.